Skip to content
ArkiNeos
Works / 03 06All projects

AMAG SKODA AND VOLKSWAGEN

Year
2016
AMAG SKODA AND VOLKSWAGEN
fig. 01 — AMAG SKODA AND VOLKSWAGEN2016

Project note

At the request of the AMAG Suisse Group, Brönnimann & Gottreux Architectes SA were commissioned to build a car dealership for the Sköda and Volkswagen brands, with a volume of approximately 40,000 m3.

My role was to coordinate the contractors and monitor the construction work.

The project plan includes a basement with parking, technical rooms and a warehouse for spare parts and tyres.

A ground floor with the display and sales areas in the southern part of the building followed by the mechanical workshops, the body workshop, the paint shop area with ovens and laboratory, and finally two car washes in the northern part.

Finally, the 1st floor houses the changing rooms and a cafeteria for employees, as well as an administrative area opening onto the double-height exhibition space

From an energy point of view, the building uses radiant panels to heat the workshops in order to limit energy losses. The building is connected to the combined wood/biogas/gas district heating plant in Haut Lac.

A biological treatment plant recycles 80% of the water used for washing vehicles.

A landscaped area forms the transition to the forest area on the northern edge of the plot. A retention basin regulates the flow of white water, which is returned directly to the Eau Froide de Roche canal.

At the request of the AMAG Suisse Group, Brönnimann & Gottreux Architectes SA were commissioned to build a car dealership for the Sköda and Volkswagen brands, with a volume of approximately 40,000 m3.

Plates

Selected imagery

05 plates

AMAG_Novile_PA_2
fig. 02AMAG SKODA AND VOLKSWAGEN
AMAG_Novile_PA_1
fig. 03AMAG SKODA AND VOLKSWAGEN
Photo 5.jpeg
fig. 04AMAG SKODA AND VOLKSWAGEN
AMAG_Novile_PA_8
fig. 05AMAG SKODA AND VOLKSWAGEN
Photo 4
fig. 06AMAG SKODA AND VOLKSWAGEN
GENTON FARM TRANSFORMATION

Next project

GENTON FARM TRANSFORMATION